Axis BTA 2100D Manual del operador Pagina 56

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 597
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 55
54
Item Description
Start Click Start to execute the desired test
Reset Cancel a test executed with Start.
System Test
Item Description
Run To Completion Click to run all tests without stopping.
Halt On Error Halts the system checks when an error is detected.
Detailed test of the heater zones
Item Description
Trap Tests the Ion Trap heater element May take up to 13.5
hours to complete.
Manifold Tests the Manifold Heater element.
Transfer Line Tests the Transfer Line heater element.
Vista de pagina 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 596 597

Comentarios a estos manuales

Sin comentarios